×
超值优惠券
¥50
100可用 有效期2天

全场图书通用(淘书团除外)

关闭
系统集成项目管理工程师计算类试题真题详解-全国计算机技术与软件专业技术资格(水平)考试参考用书

系统集成项目管理工程师计算类试题真题详解-全国计算机技术与软件专业技术资格(水平)考试参考用书

1星价 ¥13.9 (4.8折)
2星价¥13.9 定价¥29.0

温馨提示:5折以下图书主要为出版社尾货,大部分为全新(有塑封/无塑封),个别图书品相8-9成新、切口有划线标记、光盘等附件不全详细品相说明>>

暂无评论
图文详情
  • ISBN:9787302445722
  • 装帧:一般胶版纸
  • 册数:暂无
  • 重量:暂无
  • 开本:32开
  • 页数:148
  • 出版时间:2016-10-01
  • 条形码:9787302445722 ; 978-7-302-44572-2

本书特色

系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试, 也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大 量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题, 在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选 择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切 为考生和读者能够真正吃透计算题服务。参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清 晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。

内容简介

系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。 古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。 本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切为考生和读者能够真正吃透计算题服务。 参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。

目录

目 录 第1章 进度管理计算题 ······································································1 1.1 单代号网络图 ················································································1 1.1.1 知识点回顾 ·····················································································1 1.1.2 历年试题解析 ··················································································2 1.2 双代号网络图 ················································································4 1.2.1 知识点回顾 ·····················································································4 1.2.2 历年试题解析 ··················································································5 1.3 关键路径法 ···················································································6 1.3.1 知识点回顾 ·····················································································6 1.3.2 历年试题解析 ··················································································8 1.4 进度压缩 ·····················································································14 1.4.1 知识点回顾 ···················································································14 1.4.2 历年试题解析 ················································································14 1.5 资源优化 ·····················································································18 1.5.1 知识点回顾 ···················································································18 1.5.2 历年试题解析 ················································································19 1.6 PERT估算 ···················································································22 1.6.1 知识点回顾 ···················································································22 1.6.2 历年试题解析 ················································································23 1.7 进度估算 ·····················································································28 1.7.1 知识点回顾 ···················································································28 1.7.2 历年试题解析 ················································································28 1.8 进度综合案例 ···············································································33 1.8.1 (2009上半年,下午)试题二···························································33 1.8.2 (2011下半年,下午)试题二 ···························································35 1.8.3 (2013上半年,下午)试题二···························································37 ·VI· 第2章成本管理计算题 ···································································· 40 2.1 成本类型 ·····················································································40 2.1.1 知识点回顾 ··················································································· 40 2.1.2 历年试题解析 ················································································ 40 2.2 成本估算 ·····················································································45 2.2.1 知识点回顾 ··················································································· 45 2.2.2 历年试题解析 ················································································ 46 2.3 成本预算 ·····················································································50 2.3.1 知识点回顾 ··················································································· 50 2.3.2 历年试题解析 ················································································ 51 2.4 挣值管理 ·····················································································55 2.4.1 知识点回顾 ··················································································· 55 2.4.2 历年试题解析 ················································································ 59 2.5 成本预测 ·····················································································68 2.5.1 知识点回顾 ··················································································· 68 2.5.2 历年试题解析 ················································································ 69 2.6 成本综合案例 ···············································································72 2.6.1 (2009下半年,下午)试题四··························································· 73 2.6.2 (2010上半年,下午)试题二··························································· 74 2.6.3 (2010下半年,下午)试题二 ·························································· 75 2.6.4 (2011 上半年,下午)试题二 ··························································· 77 2.6.5 (2012下半年,下午)试题三··························································· 79 2.6.6 (2013下半年,下午)试题四··························································· 85 2.6.7 (2014上半年,下午)试题四··························································· 87 第3章进度成本综合案例题 ······························································ 89 3.1 (2012上半年,下午)试题二 ··························································89 3.2 (2014下半年,下午)试题一 ··························································92 3.3 (2015上半年,下午)试题一 ··························································94 3.4 (2015下半年,下午)试题四 ··························································98 ·VII· 第4章风险管理计算题 ···································································103 第5章招标采购计算题 ···································································108 5.1 历年试题解析 ············································································· 108 5.2 综合案例 ··················································································· 120 5.2.1 (2009下半年,下午)试题一··························································120 5.2.2 (2013下半年,下午)试题二··························································122 5.2.3 (2015下半年,下午)试题一··························································123 第6章立项管理计算题 ···································································125 第7章信息技术计算题 ···································································129 第8章集成资质计算题 ···································································139
展开全部

预估到手价 ×

预估到手价是按参与促销活动、以最优惠的购买方案计算出的价格(不含优惠券部分),仅供参考,未必等同于实际到手价。

确定
快速
导航