×
超值优惠券
¥50
100可用 有效期2天

全场图书通用(淘书团除外)

关闭
铁路隧道监控量测技术规程:Q/CR 9218-2015:英文

铁路隧道监控量测技术规程:Q/CR 9218-2015:英文

1星价 ¥200.0 (8.0折)
2星价¥200.0 定价¥250.0
暂无评论
图文详情
  • ISBN:9787113228491
  • 装帧:一般胶版纸
  • 册数:暂无
  • 重量:暂无
  • 开本:30cm
  • 页数:25页
  • 出版时间:2017-09-01
  • 条形码:9787113228491 ; 978-7-113-22849-1

内容简介

《铁路隧道监控量测技术规程(Q\\CR9218-2015 英文版)》内容包括: 1.0.1 This Specification is formulated with a view to standarding the measurement work in the design and construction of railway tunnels and making the construction monitoring meet the requirements of safety,applicability,being advanced in technology,economy and rationality. 1.0.2 This Specification is applicable to railway tunnels constructed by mining method. 1. 0. 3Monitoring shall be contained in the tunnel design and the cost of morutoring shall be included in the budget. 1.0.4 As a key procedure,monitoring shall be included in the site construction organization.For railway tunnels that may affect the surrounding buildings,third-party morutoring shall be carried out. 1.0.5 Besides this Specification,the monitoring of railway tunnels shall also conform to relevant current national standards,professional standards and standards of CHINA RAILWAY。

目录

1 General Provisions 2 Terms 3 Basic Requirements 4 TechnicalRequirements 4.1 GeneralRequirements 4.2 Monitoringltems 4.3 Arrangement Principle of Monitoring Cross-sections and Monitoring Points 4.4 Measurement Frequency 4.5 Control Criteria of Monitoring 4.6 Technical Requirements for Monitoring System and Instruments 5 Monitoring Methods 5.1 GeneralRequirements 5.2 Observation Inside and Outside Tunnel 5.3 DeformationMonitoring 5.4 Stress and Strain Monitoring 5.5 Contact Pressure Measurement 5 6 Blasting Vibration Monitoring ....N 5.7 Monitoring of Pressure and Volume of Pore-water 6 Data Analysis and Information Feedback 6.1 GeneralRequirements 6.2 Analysis and Processing of Monitoring Data 6.3 Monitoring Information Feedback and Engineering Countermeasures 7 Achievement Data Appendix A Record Table of Geological Condition of Excavation Face Appendix B Record Table of Tunnel Convergence Appendix C Record Table of Crown Settlement Words Used for Different Degrees of Strictness
展开全部

预估到手价 ×

预估到手价是按参与促销活动、以最优惠的购买方案计算出的价格(不含优惠券部分),仅供参考,未必等同于实际到手价。

确定
快速
导航