×
超值优惠券
¥50
100可用 有效期2天

全场图书通用(淘书团除外)

关闭
深埋长隧洞TBM施工组织设计关键技术(英文版)

深埋长隧洞TBM施工组织设计关键技术(英文版)

1星价 ¥42.6 (7.1折)
2星价¥42.6 定价¥60.0
暂无评论
图文详情
  • ISBN:9787550931848
  • 装帧:一般胶版纸
  • 册数:暂无
  • 重量:暂无
  • 开本:16开
  • 页数:200
  • 出版时间:2021-12-01
  • 条形码:9787550931848 ; 978-7-5509-3184-8

内容简介

This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground e\ngineering construction.

目录

Translator′s Preface Preface Chapter 1;;Layout and construction of TBM adit (1) 1. 1;;Layout of TBM adit (1) 1. 2;;Construction method of TBM adit (14) Chapter 2;;TBM type selection (30) 2. 1;;TBM types (30) 2. 2;;Advantages and disadvantages of various types of TBM (35) 2. 3;;TBM host selection principle (37) 2. 4;;TBM host selection (38) 2. 5;;Introduction of TBM under development (45) Chapter 3;;TBM configuration (47) 3. 1;;Open TBM configuration (47) 3. 2;;Single shield TBM configuration (55) 3. 3;;Double shield TBM configuration (58) 3. 4;; DSU-C (62) Chapter 4;;TBM asly, stepping (sliding) and launching (63) 4. 1;;TBM asly (63) 4. 2;;Concept of TBM stepping and sliding (69) 4. 3;;TBM launching (71) Chapter 5;;TBM construction of deep buried long tunnel (75) 5. 1;;Tunnel TBM construction (75) 5. 2;;Construction section of TBM through drilling and blasting method (86) 5. 3;;Maintenance and disasly of TBM (87) Chapter 6;;TBM construction and transportation (90) 6. 1;;TBM construction transportation object (90) 6. 2;;Tunnel slag transportation (90) 6. 3;;Material transportation (93) 6. 4;;Train formation (96) 6. 5;;Locomotive configuration (96) Chapter 7;; Ventilation (100) 7. 1;;Ventilation standard (100) 7. 2;;Construction ventilation equipment (106) 7. 3;;Calculation parameters and formulas of construction ventilation (111) 7. 4;;Construction ventilation calculation (114) Chapter 8;; Cooling (132) 8. 1;;Ambient temperature in tunnel (132) 8. 2;;Main heat sources for TBM construction of deep buried long tunnels (132) 8. 3;;Calculation of heat in the tunnel (133) 8. 4;;Cooling measures in tunnel (137) 8. 5;;Cooling calculation model for TBM construction of deep buried long tunnel (137) Chapter 9;; Drainage (148) 9. 1;;Discharge forecast (148) 9. 2;;Design of TBM construction drainage system (150) 9. 3;;Water hammer calculation (155) 9. 4;;Avoidance of water hammer (158) Chapter 10;;Power supply (159) 10. 1;;Main power load (159) 10. 2;; Voltage (159) 10. 3;;Construction power supply load estimation (160) Chapter 11;;Construction management of precast concrete segment (164) 11. 1;;Scale of precast concrete segment plant (164) 11. 2;;Production process of precast concrete segment (166) 11. 3;;Layout of precast concrete segment plant (167) Chapter 12;;Countermeasures of TBM construction in unfavorable geological section (169) 12. 1;;Main geological risks of deep buried long tunnels (169) 12. 2;;Measures to deal with main geological risks of deep buried long tunnels (169) 12. 3;;Stuck treatment measures (180) Chapter 13;;Schedule of TBM construction (192) 13. 1;;Scheduling principles (192) 13. 2;;TBM drilling feeler (192) 13. 3;;Other progress indicators (195) 13. 4;;TBM construction schedule preparation (197) Reference (199)
展开全部

预估到手价 ×

预估到手价是按参与促销活动、以最优惠的购买方案计算出的价格(不含优惠券部分),仅供参考,未必等同于实际到手价。

确定
快速
导航